New Build Home
A full design & build project - documented from groundwork to final finish
Enquire About a New Build EstimateBuild Progress Photos
Phase 3 - Steels Installation
With the floor structure in place, we moved on to installing the structural steels that will carry key loads across the build. This stage is critical because the steelwork helps lock the structural layout together, supports openings and spans, and sets up the next phase of masonry, framing, and roof construction accurately.
Phase 2 - Block and Beam Flooring Stage
With the footings complete, we moved on to installing the block and beam floor. The beams are set out and positioned to create a rigid, load-bearing deck, then the infill blocks complete the span. This gives a clean, level base that's ready for the next layers of the floor build-up and the structure above.
Phase 1 - Trench Footings & Concrete Pour
This stage is where the foundations start properly taking shape. We excavated the trench footings to the required depth and width, then poured the concrete to form a strong, stable base. Getting this right is what allows the next stages to go up straight, level, and properly supported.
Planning a New Build Home?
From groundwork and structure to plumbing, electrics, and final finishes - we coordinate every stage of your new build. Get in touch to discuss your plans and request a clear, fixed estimate.
Request a Free New Build EstimateWhy Clients Choose Rainbow for New Build Projects
Groundworks to Completion
We can manage the build from the very first excavation through to final snagging - with clear stages and dependable workmanship.
Building + Plumbing + Electrics
A coordinated multi-trade team reduces delays, improves quality control, and keeps communication simple for the client.
Clear Planning & Updates
We plan work in logical phases and provide progress updates - ideal for clients who want visibility from start to finish.
Our New Build Process
Plan & Estimate
We discuss your goals, drawings/spec, site constraints, and budget - then provide a clear estimate and build plan.
Groundworks & Foundations
Excavation, trench footings, concrete pours, drainage and oversite preparation - setting the build up properly from day one.
Structure & First Fix
Walls, structural elements, roofing, then first fix plumbing and electrics - coordinated to keep the programme moving.
Second Fix & Finish
Insulation, plastering, second fix, kitchens/bathrooms, finishes and snagging - ready for handover.
New Build FAQs
Can you build in phases and update as we go?
Yes - many new builds progress in clearly defined stages. We can plan the works in phases (like groundworks, structure, first fix, second fix) and provide updates as each stage is completed.
Do you handle plumbing and electrics as part of the build?
Yes. We coordinate building work alongside plumbing and electrical services, which helps maintain momentum and keeps responsibility clear under one team.
What is included in the groundwork stage?
Typically excavation, trench footings, concrete pours, drainage/ducts (where required), and oversite preparation - ensuring the structure above has a stable base.
How do I get a quote for a new build?
Use our free estimate form. If you have drawings/specifications, send them over - we'll advise on the next steps and provide a clear estimate.

